Tracking risks
The Risks tab is a structured risk register. Capture risks early, score them, and document mitigation plans.
Each risk has:
• Title — one-line summary
• Description — what's the risk and why does it matter
• Severity — Low / Medium / High / Critical (sorted by severity in the table)
• Likelihood — Low / Medium / High
• Mitigation — your plan to reduce or avoid it
• Status — Open (active), Mitigated (plan in motion), Closed (no longer applicable)
The Overview tab surfaces open risks count and the critical-open count as a stat tile, so the project manager sees risk pressure at a glance.
Tip: log risks as soon as they surface, not at the next status meeting. Even a 30-second entry saves the conversation later when "we should have flagged this two weeks ago" comes up.